Factory Kit is an intuitive self-service solution that includes everything that engineers need to quickly design, build and deployManufacturing Apps without writing code.
Tul;p
Syncron Service Cloud offersa fully integrated solutionstack for the optimization ofthe service supply chain journey, from beginning to end.
S;ncron
CONNECT3D platform extendsinto the cloud, allowing the digitalthread for 3D printing to moveall the way through to the finalpost-printing step.
PostProcess Technolo;;es
MCOS-MOS V4.2
metrologysoftwarefor Mitu-toyo co-ordinatemeasuring machines is a proprietarymetrology suite of inter-relat-ed modules and dedicatedexpansion modules for Microsoft Windows.
M;tuto;o Amer;c; Corp;
Macola 10. 7 revolutionizes theway customers extend and customize their ERP investment, expands the Macola ecosystemwith new 3rd party APIs, and doubles down on user experience.
EC; Softw;re Solut;ons
NED ROBOTICSNEWSLETTER
SUBSCRIBE TODAY!
Inside scoop on the
newest robots, systems,
and automation, and
how they affect the plant
floor and everyday life.
FEBRUARY
ISSUE PREVIEW
Plant Maintenance
Energy Savers
Automation
Testing & Inspection
1/15/2021
SPECIAL SECTION
SPOTLIGHT
SPOTLIGHT
SPOTLIGHT
ISSUE CLOSE
MATERIAL DUE
NOW PROUDLY
PRODUCED BY
Visit www.nedinfo.com/76482-601
2005NED_ViCasMFg.indd 1 4/15/20 9:42AM
Visit www.nedinfo.com/76482-602
Durometers
Type Shore A Normal rubberType Shore D Hard rubber & plasticsType Shore E Soft rubber & sponge
Easy-to-use. Make reliable, highlyaccurate, quick measurements.
Heavy-duty metal case
● Optional peak indicatoravailable
NIST Certincluded
Rubber & Plastic Hardness Testers
866-527-4666
www.hoto-instruments.com
2005NED_IMADA_DU.indd 1 4/14/20 3:13PM
Visit www.nedinfo.com/76482-605
2005NED_RoyalProducts.indd 1 4/15/20 9:33AM
Visit www.nedinfo.com/76482-603
FAR 25.853 Certified Epoxy Adhesives
• Flame retardant
• For bonding, sealing & coating
• Used in aircraft interior applications
www.masterbond.com
2012NED_Masterbond.indd 1 11/16/20 1:14PM
Visit www.nedinfo.com/76482-604
2011NED_SpliceMax.indd 1 10/20/20 4:20PM